News & Activities
About Us
Programmes
People
Facilities
Research
Career
Facilities
Student Society
Job Vacancies
Intranet
Download
¡@ Home > People > Academic Staff sitemaphome
Cai, Xiaoqiang
(½²¤p±j)
¡@

Professor 

BEng (Harbin Shipbuilding Engineering   Institute) 
MEng , DEng (Tsinghua University)

¡@

¡@ ¡@
Office: Room 709C, William M.W. Mong Engineering Building
Phone: (852) 2609-8321
Fax: (852) 2603-5505
E-mail: xqcai@se.cuhk.edu.hk

Xiaoqiang Cai received his B.Eng. degree from the Harbin Shipbuilding Engineering Institute in 1982 and his M.Eng. and D.Eng. degrees from Tsinghua University, in 1985 and 1988 respectively. During 1989-91, he conducted postdoctoral research at The University of Cambridge and The Queen's University of Belfast. He was Lecturer of Applied Mathematics at The University of Western Australia, before he joined The Chinese University of Hong Kong as Lecturer in 1993. He had been the Chairman of the Department of Systems Engineering and Engineering Management during 1996-2003, and Professor since October 2000. His research at present concentrates on scheduling models and algorithms, logistics management, network optimization, and portfolio optimization. He has published extensively in leading journals in these areas, such as Operations Research, Management Science, Naval Research Logistics, IIE Transactions, and IEEE Transactions. He is on the editorial boards of several international journals, including IIE Transactions on Scheduling and Logistics, and the Journal of Scheduling.  

¡@

Research Interests 

  Logistics and supply chain management 
  New Scheduling models and applications
  Portfolio optimization

Selected Publications  

X. Cai. D. Sha, and C.K. Wong, Time-Varying Network Optimization, Springer, ISBN: 978-0-387-71214-7, 223p. , 2007

X. Cai, X.Y. Wu, and X. Zhou, "Single-machine scheduling with general costs under compound-type distributions". Accepted by Journal of Scheduling.


X.P. Song and X. Cai, "On optimal payment time for a retailer under permitted delay of payment by the wholesaler", International Journal of Production Economics, 103, 246-251, June 2006.

X. Cai, X.Y. Wu and X. Zhou, "Dynamically Optimal Policies for Stochastic Scheduling Subject to Preemptive-Repeat Machine Breakdowns". Accepted by IEEE Transactions on Automation Science and Engineering.  

A.S.F. Ng, T. Sastry, J. Leung, and X. Cai, "On the Uncapacitated K-Commodity Network Design Problem with Zero Flow-Costs". Accepted by Naval Research Logistics.  

X. Cai, X.Q. Sun, and X. Zhou, "Stochastic Scheduling Subject to Machine Breakdowns: The Preemptive-Repeat Model with Discounted Reward and Other Criteria". Naval Research Logistics, Vol. 51, pp. 800-817, 2004.  

X. Cai and X. Zhou, "Deterministic and Stochastic Scheduling with Team-Work Tasks". Naval Research Logistics, Vol. 51, pp. 818-840, 2004.  

X. Cai, K.L. Teo, X.Q. Yang, and X.Y. Zhou,"Minimax Portfolio Optimization: Empirical Numerical Study". Journal of The Operational Research Society, Vol. 55, pp 65-72. 2004  

X. Cai, X.Q. Sun, and X. Zhou, "Stochastic Scheduling with Preemptive-Repeat Machine Breakdowns to Minimize the Expected Weighted Flowtime". Probability in the Engineering and Informational Sciences, Vol. 17, pp. 467-485. December 2003.  

George Vairaktarakis, and X. Cai, "The Value of Processing Flexibility in Multipurpose Machines". IIE Transactions on Scheduling and Logistics, Vol. 35, pp. 763-774. 2003. 

G.C. Zhang, X. Cai, C.-Y. Lee, and C.K. Wong, "Minimizing Makespan on a Single Batch Processing Machine with Nonidentical Job Sizes". Naval Research Logistics, Vol. 48, pp. 226-240. 2001.  

X. Cai, K.L. Teo, X.Q. Yang, and X.Y. Zhou, "Portfolio Optimization under a Minimax Rule". Management Science, Vol. 46, pp. 957-972. 2000.  

X. Cai, C. Y. Lee, and T.L. Wong, "Multi-Processor Task Scheduling to Minimize the Maximum Tardiness and the Total Completion Time", IEEE Transactions on Robotics and Automation. Vol. 16, pp. 824-830. December 2000. 

X. Cai and S. Zhou, "Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs". Operations Research,Vol.47, pp. 422-437, 1999.

C.L. Li, X. Cai and C.Y. Lee, "Machine Scheduling withMultiple-Job-On-One-Processor Pattern". IIE Transactions on Scheduling and Logistics, Vol. 30, pp. 433-446, 1998  

X. Cai, C.J. Goh and A.I. Mees, "Greedy Heuristics for Rapid Scheduling of Trains on a Single Track". IIE Transactions on Scheduling and Logistics, Vol. 30, pp. 481-494. 1998 

 

¡@ ¡@
¡@ Email: dept@se.cuhk.edu.hk Tel: +852 2609-8313 Fax: +852 2603-5505
Address: Room 609, William M. W. Mong Engineering Building, The Chinese University of Hong Kong, Shatin, N.T., Hong Kong

¡@
© COPYRIGHT 2005 SEEM, CUHK

¡@

¡@